Mechanical Insulation Appraisal · Preliminary Report

Anheuser-Busch Brewery - St Louis MO - Tunnel N

Engineered findings from a NAIMA 3E Plus walk-down assessment. 34 items inventoried across 8 systems · estimated $6,054/yr in recoverable operating cost.

Executive Summary

Overview of identified insulation upgrade opportunities and projected annual savings. This is a Preliminary Report. Please see the 'Line Item Detail' Page for detailed information about each item assessed along with Infrared Imaging. Your EEQA representative will now solicit bids from our Qualified Contractors. Please allow 4-6 weeks for the bidding to complete. Your EEQA representative will then submit to you a Final Report upon it's completion. All completed upgrades will have a Quality Control visit to ensure the Mechanical Insulation was installed in accordance with specifications.

Estimated Annual Savings
$6,054/yr
Energy cost reduction from upgrades
Current Operating Cost
$6,673/yr
Inventoried surface annual cost
Upgraded Operating Cost
$619/yr
After insulation improvements
Cost Reduction
90.7%
Operating cost decrease
Heat Flow Reduction
932,262kBtu/yr
932.3 MMBtu/yr saved
CO₂ Reduction
61.60MT/yr
Metric tons per year
NOₓ Reduction
271.9lbs/yr
Pounds per year
Items Assessed
34items
Across 8 systems
Annual Operating Cost Comparison
Current (As-Found)
$6,673
per year
After Upgrade
$619
per year

Upgrading the insulation on the 34 identified items would result in estimated annual energy cost savings of $6,054/yr, a reduction in heat flow of 932,262 kBtu/yr, a reduction in CO₂ emissions of 61.60 MT/yr, and a reduction in NOₓ emissions of 271.9 lbs/yr. All calculations were performed using the NAIMA 3E Plus (version 5.1) computer program.

Savings Analysis

Energy cost savings by system area, ranked by annual impact.

Annual Energy Cost Savings by System
5-Year Projected Savings
5-Year Energy Savings
$30,269
Cumulative cost avoidance
5-Year Heat Flow Saved
4,662MMBtu
Cumulative thermal savings
5-Year CO₂ Avoided
308.0MT
Equivalent to ~13 cars off the road/yr
Environmental Impact

Emissions reductions achieved through insulation upgrades.

CO₂ Reduction
61.60MT/yr
Metric tons carbon dioxide
NOₓ Reduction
271.9lbs/yr
Pounds nitrogen oxides
Equivalent Cars Removed
~13/yr
Based on avg 4.6 MT CO₂/car/yr
Heat Flow Saved
932.3MMBtu/yr
Thermal energy conserved
CO₂ Reduction by System
System Breakdown

Summary of each system/equipment group.

SystemItemsCurrent $/yrUpgraded $/yrSavings $/yrHeat kBtu/yrCO₂ MT/yrNOₓ lbs/yr
Line-Item Detail

Complete per-item inventory with specifications and savings. Click the Item Description to view Thermal Images.

#DescriptionPipeQtyTemp °FInv. Ins.Upg. Ins.Inv ThkUpg ThkCurrent $/yrUpgraded $/yrSavings $/yrHeat kBtu/yrCO₂ MT/yr
Thermal Imaging

Infrared and visible-light photo pairs for each assessed equipment item.

STL 116

Valve & Bonnet · Overhead · Ref: 112018
Infrared
IR: Ref 112018 - IR
Ref 112018 - IR
Visible
VIS: Ref 112018 - VIS
Ref 112018 - VIS

STL 116

Valve & Bonnet · Overhead · Ref: 113006
Infrared
IR: Ref 113006 - IR
Ref 113006 - IR
Visible
VIS: Ref 113006 - VIS
Ref 113006 - VIS

STL 117

Pipe · Lower/ Ground Level · Ref: 113649
Infrared
IR: Ref 113649 - IR
Ref 113649 - IR
Visible
VIS: Ref 113649 - VIS
Ref 113649 - VIS

STL 117

Pipe · Lower/ Ground Level · Ref: 113840
Infrared
IR: Ref 113840 - IR
Ref 113840 - IR
Visible
VIS: Ref 113840 - VIS
Ref 113840 - VIS

STL 118

Pipe · Lower/ Ground Level · Ref: 114311
Infrared
IR: Ref 114311 - IR
Ref 114311 - IR
Visible
VIS: Ref 114311 - VIS
Ref 114311 - VIS

STL 118

Pipe · Lower/ Ground Level · Ref: 114411
Infrared
IR: Ref 114411 - IR
Ref 114411 - IR
Visible
VIS: Ref 114411 - VIS
Ref 114411 - VIS

STL 119

Pipe · Lower/ Ground Level · Ref: 114119
Infrared
IR: Ref 114119 - IR
Ref 114119 - IR
Visible
VIS: Ref 114119 - VIS
Ref 114119 - VIS

STL 119

Pipe · Lower/ Ground Level · Ref: 114753
Infrared
IR: Ref 114753 - IR
Ref 114753 - IR
Visible
VIS: Ref 114753 - VIS
Ref 114753 - VIS

STL 120

Pipe · Lower/ Ground Level · Ref: 115646
Infrared
IR: Ref 115646 - IR
Ref 115646 - IR
Visible
VIS: Ref 115646 - VIS
Ref 115646 - VIS

STL 121

Pipe · Lower/ Ground Level · Ref: 120143
Infrared
IR: Ref 120143 - IR
Ref 120143 - IR
Visible
VIS: Ref 120143 - VIS
Ref 120143 - VIS

STL 121

Pipe · Lower/ Ground Level · Ref: 120111
Infrared
IR: Ref 120111 - IR
Ref 120111 - IR
Visible
VIS: Ref 120111 - VIS
Ref 120111 - VIS

STL 122

Pipe · Lower/ Ground Level · Ref: 120905
Infrared
IR: Ref 120905 - IR
Ref 120905 - IR
Visible
VIS: Ref 120905 - VIS
Ref 120905 - VIS

STL 122

Pipe · Lower/ Ground Level · Ref: 122317
Infrared
IR: Ref 122317 - IR
Ref 122317 - IR
Visible
VIS: Ref 122317 - VIS
Ref 122317 - VIS

STL 123

Socket 90 · Lower/ Ground Level · Ref: 122015
Infrared
IR: Ref 122015 - IR
Ref 122015 - IR
Visible
VIS: Ref 122015 - VIS
Ref 122015 - VIS

STL 123

Socket 90 · Lower/ Ground Level · Ref: 121834
Infrared
IR: Ref 121834 - IR
Ref 121834 - IR
Visible
VIS: Ref 121834 - VIS
Ref 121834 - VIS

STL 123

Socket 90 · Lower/ Ground Level · Ref: 122121
Infrared
IR: Ref 122121 - IR
Ref 122121 - IR
Visible
VIS: Ref 122121 - VIS
Ref 122121 - VIS
Parameters & Methodology

Project-specific inputs and calculation methodology.

Project Parameters
Boiler Efficiency80%
Hours of Operation8,300 hrs/yr
Ambient Temperature75 °F
Wind Speed0 mph
Fuel TypeNatural Gas
Fuel Cost$5.33/Mcf

Calculation Engine

All calculations performed using NAIMA 3E Plus (v5.1), based on ASTM C680 methodology.

Inventoried Condition

Each item assessed in as-found condition. Bare surfaces have no insulation present.

Upgraded Specification

Recommended upgrades include fiberglass, cellular foam, elastomeric, and ceramic fibre materials.

Emissions Methodology

CO₂ and NOₓ calculated using EPA fuel-specific emission factors applied to energy saved.